Raikes Lane Railway Bridge

In 2009 Carver were appointed by BAM Nuttall and Network Rail to manufacture and install the steel railway bridge at Raikes Lane. The railway bridge crossed over a single carriageway and was located just south of Bolton.

The project consisted of 2no. Access walkways and 1no. Bridge span, which was reinforced with concrete throughout the deck and side beams. Carver provided the entire Turnkey solution included Steel Fabrication, paint treatment, concrete and site installation.

Carver Engineering are the UK’s leading Steel Fabrication Experts - if you have a project enquiry please call us on +44 (0)1302 751900 or send us your enquiry using our contact form here